ORGANIZATION WORK MGMT PROCESS:  FAQ 3 OF 10

3. How does PaSTA provide the functionality to support the 6 planning sub activities of:
What must be done, who must do it, spares required, tools required, estimated duration, estimated cost?

owm3.jpg

1.     PaSTA provides the visibility to see all work and has built in ‘process controls’ to ensure the process to address work is followed.  If not, the breakdown is identified and the responsible group is automatically notified.

2.     PaSTA allows the ‘process controls’ to be classified by group(s) or individuals and their activities tracked.

3.       These are visible to everyone and are a simple ‘drag and drop’ to ensure the spares /equipment are reserved.

4.     Each job’s duration can be modified to ensure that the job fits the work schedule.  These jobs can be grouped and sorted biased by; time, area, priority, equipment, etc.  Jobs can also be grouped so they are kept together regardless of how things move around on the schedule (relationships; start to start, start to finish, etc.).

PaSTA allows the user to sum up the estimated cost for a job, group of jobs, a project or a work week.  This allows the organization to do cash flow analysis.