ORGANIZATION WORK MGMT PROCESS: FAQ 5 OF 10
5. How does PaSTA determine the availability of resources?
PaSTA has two ways to determine resources availability:
- Shift patterns can be imbedded within one another. The definition of a shift pattern is the shortest amount of time before the pattern repeats; e.g. 4x10, 5x8 are 1 week patterns; “rolling 90” is an example of multiple week patterns.
- Resource leveling; PaSTA graphically shows the availability of individuals and/or craft to perform the work needed.